Support with DNO applications, new and upgraded supply requirements, utility liaison, maximum-demand assessments, transformer and substation strategy, HV/LV interface design and connection coordination for larger agricultural and rural developments.

Our design review considers maximum demand, diversity, incoming-supply capacity, distribution routes, cable sizing, voltage drop, earthing arrangements and future spare capacity before equipment is selected.
What we can provide
Support with DNO applications, new and upgraded supply requirements, utility liaison, maximum-demand assessments, transformer and substation strategy, HV/LV interface design and connection coordination for larger agricultural and rural developments.
- DNO applications and utility liaison
- Maximum-demand and future-load assessments
- Transformer and substation strategy
- HV/LV interface and protection coordination
- Connection planning for larger rural developments
Planned to suit the site
Infrastructure and energy projects rarely fit a standard template. We assess the existing supply, distribution, operating requirements, future loads, access and resilience needs before recommending a practical solution. The final scope is confirmed following survey and design.